Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Alkaissy, M, Arashpour, M, Zeynalian, M and Li, H (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management, 148(06).

Aroke, O, Hasanzadeh, S, Esmaeili, B, Dodd, M D and Brock, R (2022) Using Worker Characteristics, Personality, and Attentional Distribution to Predict Hazard Identification Performance: A Moderated Mediation Analysis. Journal of Construction Engineering and Management, 148(06).

Candaş, A B and Tokdemir, O B (2022) Automating Coordination Efforts for Reviewing Construction Contracts with Multilabel Text Classification. Journal of Construction Engineering and Management, 148(06).

Chen, G, Chen, J, Tang, Y, Li, Q and Luo, X (2022) Identifying Effective Collaborative Behaviors in Building Information Modeling–Enabled Construction Projects. Journal of Construction Engineering and Management, 148(06).

Dou, Y and Bo, Q (2022) Characteristics and Dynamics of BIM Adoption in China: Social Network Analysis. Journal of Construction Engineering and Management, 148(06).

Hussein, M, Darko, A, Eltoukhy, A E E and Zayed, T (2022) Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. Journal of Construction Engineering and Management, 148(06).

Jiang, S, Ma, G, Jia, J, Wu, M and Wu, Z (2022) Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Journal of Construction Engineering and Management, 148(06).

Liu, G, Huang, R, Li, K, Shrestha, A and Fu, X (2022) Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management. Journal of Construction Engineering and Management, 148(06).

Liu, K and El-Gohary, N (2022) Bridge Deterioration Knowledge Ontology for Supporting Bridge Document Analytics. Journal of Construction Engineering and Management, 148(06).

Liu, T, Chong, H, Zhang, W, Lee, C and Tang, X (2022) Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement. Journal of Construction Engineering and Management, 148(06).

Lv, L, Wang, Z, Li, H, Zhang, C and Qiao, R (2022) Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity. Journal of Construction Engineering and Management, 148(06).

Shen, K, Li, X, Cao, X and Zhang, Z (2022) Prefabricated Construction Process Optimization Based on Rework Risk. Journal of Construction Engineering and Management, 148(06).

Wang, S, Ni, Z, Qu, T, Wang, H and Pan, Q (2022) A Novel Index to Evaluate the Workability of Conditioned Coarse-Grained Soil for EPB Shield Tunnelling. Journal of Construction Engineering and Management, 148(06).

Yang, Y, Pan, M and Pan, W (2022) Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects. Journal of Construction Engineering and Management, 148(06).

Zhan, W, Pan, W and Hao, G (2022) Productivity Measurement and Improvement for Public Construction Projects. Journal of Construction Engineering and Management, 148(06).

  • Type: Journal Article
  • Keywords: Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002282
  • Abstract:
    Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.

Zhong, S and Elzarka, H (2022) A Hybrid Grey System Theory–Based Subcontractor Selection Model for High-Stakes Construction Projects. Journal of Construction Engineering and Management, 148(06).